Tried tagging my sling angle on the load chart with red tape, cut my set-up time by 15 minutes
I used to eyeball the boom angle and then double check everything on the load chart, and it ate up 20 minutes before each pick on a 60 ton Grove. I started putting a small strip of red tape on the chart plastic at the angles for the lifts I run most, so now I can just glance and go. Anyone else marking their charts like this or is there a better way to speed up those repeat picks?