I wrote off anti-sway systems for years, then a gust at the Beaumont job proved me wrong
I was setting a 4,000 lb panel on a parking structure in Beaumont last Thursday when a gust caught the load and it started swinging toward two guys on the deck. I eased off the swing and let the anti-sway do its thing instead of fighting it like I always figured I would, and the load settled in about 3 seconds flat. For the guys who've run both, do you trust the computer in a gust or do you still ride the brake yourself?