Shoutout to the estimator who showed me our software was hiding 12% waste in every takeoff
Last week our estimator pulled me aside at the office in Boise and walked me through the waste factor settings buried in our takeoff tool. Turns out the default was set to 12% on lumber and we never touched it, so we've been over-ordering on every single job since we started using the thing 8 months ago. He said the vendor never mentioned it during setup and the manual barely covers it. I went back through three recent bids and figured we left around $4,300 on the table in extra material. Has anyone else found a default setting like this hiding in their software, and what else should I be checking?