Pro tip: tracked my seam jobs for 3 months and the number was way lower than I guessed
I figured I was eating a callback on maybe 1 in 10 of my seamed rooms, so I started writing every one down in a notebook I keep in the van. After 74 seam jobs since March I only had 4 that needed a fix, and 3 of those were the same builder's slab in Beaverton. Turns out my gut was way harder on me than my actual work. Anyone else keep a log like this, and what do you track in it?