Am I the only one who switched from a rosebud to a smaller tip for preheat on thin tube sheets?
Back when I first got on the tools, I used to grab the biggest rosebud in the gang box for everything, thinking more heat meant faster work. About two years ago we were doing a tube sheet job over in Beaumont and my old hand kept watching me warp a thin plate just a touch before I even started rolling. He pulled me aside and said to drop down to a #4 or #6 and just walk the heat around instead of parking it in one spot, and I admit I fought him on it for a week. Once I actually tried it, the plate stayed flat and I quit burning up a whole shift fixing warp, and I stopped going through so much acetylene too. Your mileage may vary depending on what you're on, and some thick stuff still needs the big tip, but for thin tube sheets it's been a real change for me. What tip size do you all reach for on preheat, and did you ever get talked out of the rosebud habit?