Why does nobody talk about labeling zone wires before dressing the can
I used to dress the can first and then hunt for zone wires with a toner on every single job, and I paid for it on a 14 zone panel in Reno last month when two loops got swapped. Now I tag each conductor with a wrap of numbered tape and map it on the door card before anything gets tucked, and my trim calls dropped to almost nothing. How are you all marking zones so the next guy does not have to pull the cover off twice?