Watched a crew in Phoenix mount a panel with the cover still on, and now I'm rethinking my whole rough-in
I always pulled covers and wired cans loose, but their helper had the whole 12-zone box up in 20 minutes with zero pinched wires. Anybody else switch to pre-dressed panels or am I late to this?